Blog Chart for our Film Opener!
Hi guys, welcome back to another blog. Today, I will be talking about our schedule for the rest of this final project. This will include development, pre-production, production, and post-production. Ok lets get started!
To begin with, this is a Gantt chart that took me a while to graph and plan out. It includes all the major things we have done and will do, and how many days we plan to do each thing. First is the development stage. From week 1-3, we did brainstorming for about 3 days, script writing for about 2 days, planning set for about 4 days, and blogging, which took 6 weeks to do, which is the length of the entire schedule. The blogging is very tedious since we have to explain everything included in our film, and the grand total we have to do is 46. But never mind that. Now, from week 3-4, we have pre-production. This included casting for about 1 day, set design for about 2 days, locations for about 2 days, and costumes for about 1 day. Everything besides costumes has been done by both Amaar and I. Costuming has been done by me. Next, we have production. This includes set building, practice filming, and actual filming. Set building will take 2 days, practice filming will take 1 day, and actual filming will take 2 days. Lastly, we have post-production. This includes main editing and sound editing. We plan to take 3 days on main editing and 2 days on sound editing. In conclusion, this Gantt chart will help us coordinate everything we have done already and what we will do soon.
No comments:
Post a Comment